View single post by watcher | ||||||||||
Posted: Sun Jul 17th, 2011 02:18 pm |
|
|||||||||
watcher![]()
![]() |
I should add for the sake of balance that since I wrote my earlier message in this thread I have read (on WUS) that Graeme of SAS said that he did not require the factory to do any technical drawings or design: He says he submitted full technical drawings initially and at each revision. I'm not taking sides, just passing on new (to me) information. Last edited on Sun Jul 17th, 2011 02:20 pm by watcher |
|||||||||
|